Eveline Street Reconstruction: Roundabout excavation and construction continues on the west side boulevard of Eveline Street from Queen to Dufferin. Queen to Dufferin east side excavation and construction continues. Sidewalks to be poured later this week – possibly a Thursday start.
![road closed eveline work bw photo of construction road closed](https://www.myselkirk.ca/wp-content/uploads/2022/05/road-closed-eveline-work-bw.jpeg)
Category: Infrastructure
Share this post